• PM_Your_Nudes_Please@lemmy.world
    link
    fedilink
    arrow-up
    3
    ·
    10 months ago

    You need enough sugar to bond to enough water molecules to prevent enough concrete from bonding to it. It’ll take a pound or more, because you need to “capture” the water molecules before the concrete can. The nice part is that you don’t need to be careful about it; You can just pop a bag or two straight into a concrete mixer, and let the mixer do its job.

    • Zorsith
      link
      fedilink
      English
      arrow-up
      1
      ·
      10 months ago

      Ideally maybe repack the sugar into a basic brown paper bag that will dissolve and not leave much in the way of trace dyes or waterproof packaging