• RegalPotoo@lemmy.world
    link
    fedilink
    English
    arrow-up
    79
    ·
    7 months ago

    Is there a charge for “attempted negligent homicide” or something? You did something so catastrophically stupid that was all but guaranteed to kill someone except you got lucky, but you still should end up getting censured so you don’t roll the dice on someone’s life again

  • Dr. Coomer@lemmy.world
    link
    fedilink
    English
    arrow-up
    56
    ·
    7 months ago

    When preparing/working on a machine, TURN IT OFF. IT IS LITERALLY THE FIRST STEP WHEN REPAIR ANY PIECE OF EQUIPMENT YOU STUPID PIECE OF SHIT.

    • hydroptic@sopuli.xyz
      link
      fedilink
      arrow-up
      19
      ·
      edit-2
      7 months ago

      Yeah I came here to say that this is a fucking terrifying “LOTO” (and I’m using the term very loosely here) procedure that most likely will eventually kill someone

      • KillingTimeItself@lemmy.dbzer0.com
        link
        fedilink
        English
        arrow-up
        4
        ·
        7 months ago

        absolutely. I’d almost want to disassemble something like this before cleaning it properly.

        That or have a very explicit physical lock out mechanism if it’s something like a stamping press.

      • Liz@midwest.social
        link
        fedilink
        English
        arrow-up
        9
        ·
        7 months ago

        There is always a way to disable a machine. The button has power. At the very least, the power to that button should be locked out. If it has to happen at the breaker, so be it.

        • Cataphract@lemmy.ml
          link
          fedilink
          arrow-up
          2
          ·
          7 months ago

          Only if the breaker has it’s own system for LOTO. You guys are going to get people killed lol.

        • Cataphract@lemmy.ml
          link
          fedilink
          arrow-up
          5
          ·
          7 months ago

          I’m only replying for visibility at this point because of the upvotes and the dangerous scenarios that are being promoted with this advice. Breaker with LOTO would be more acceptable but even then I wouldn’t trust it. People have been killed because something was wired up wrong and circuits were accidentally connected (meaning breakers off but currents still going from a connection down the line to another breaker, it can appear that the circuit is dead until a switch is flipped sending current and happens in home lighting constantly). Also, someone can simply plug the device into another outlet leaving them with a death on their hands.

          I know it’s dramatic and these are just comments, but something like this could save or take a life. I’ve seen too many workplace accidents and refuse to work in unsafe conditions or environments anymore even if it costs me the job. Last unsafe worksite I was in, nearly all of the workers walked out together when we arrived in the morning to start at a new site and saw what the project manager had in store for us (probably helped that the owner was hated and payroll had been getting screwed up for weeks). I’ll never forget that day and still keep in contact with most of them. We are all waiting and scared for the day a mass casualty is reported from the shitty work they were trying to make us do (some did report it to the authorities, but never heard what came of those reports).

          • bane_killgrind@lemmy.ml
            link
            fedilink
            English
            arrow-up
            1
            ·
            7 months ago

            Yes absolutely yes.

            If equipment has a removable power feed, the plug follows the worker into the kill zone or the work doesn’t get done. If the plug doesn’t reach, and LOTO doesn’t happen, the plug gets disassembled and brought into the kill zone until the worker returns it.

            Deaths because lazy are at the feet of management.

      • Cataphract@lemmy.ml
        link
        fedilink
        arrow-up
        2
        ·
        7 months ago

        If a tool or machine can simply be unplugged, and the worker performing the service remains in control of the plug, then lockout procedures aren’t necessary.

      • MartianSands@sh.itjust.works
        link
        fedilink
        arrow-up
        19
        ·
        7 months ago

        Just one padlock is enough, but you can use up to 6.

        You need all the locks removed before it’ll open, so you don’t need to count on someone to carefully count everyone back in. You just make sure that each person uses their own lock

      • batmaniam@lemmy.world
        link
        fedilink
        arrow-up
        18
        ·
        7 months ago

        I think it’s so you can create “and” conditions for unlocking. IE: If you’ve got two locks, each with their own key, both person 1 AND person 2 need to unlock it. So you can have multiple people and/or multiple crews working on the machine across different aspects. Maybe one crew is doing electric, the other some kind of plumbing, and they’re working at different times. When one crew finishes their work, they can release their lockout without making it unsafe for the other crew.

        • Mirshe@lemmy.world
          link
          fedilink
          arrow-up
          12
          ·
          7 months ago

          Exactly this. Everyone working on that machine slaps their lock on it, and every last lock needs to be removed before the tag can come off. The welders might finish in half a day, but the electrical or water or hydraulic guys might need a whole weekend to get done, so this makes sure someone doesn’t say “oh the lock is gone” and make mincemeat out of some dude’s head.

          • batmaniam@lemmy.world
            link
            fedilink
            arrow-up
            3
            ·
            7 months ago

            Thought so. I work around this stuff but my end of it usually low voltage/low pressure/ low risk. We should observe it more but usually we just have someone that LOTOs anything going to us.

            But yeah, and for anyone else, repairs can wind up being more complicated than anticipated, parts arrive late, etc. It’s not uncommon for these to be in place for weeks sometimes when say, electrical starts something, but then plumbing needs to finish whatever before the pump motor hookup can be complete. Before you know it it’s 2 weeks later, electrical had a bunch of other jobs. The LOTO makes sure they come and inspect before unlocking rather than go “yeahhhh I’m pretty sure we left that ready to turn on, go for it” plus making sure no other work got screwed up (like a wire conduit getting drilled into by plumbing).

            To be sure, handing off the keys does happen, but if and when it happens there’s the weight of “by handing this off you’re personally taking responsibility”.

            • waz@feddit.uk
              link
              fedilink
              English
              arrow-up
              4
              ·
              7 months ago

              You’re entitled, usually required, to add your personal lock onto this when you start working on a locked out job, that way you can be confident they’ll come looking for the last guy to lock off the job before they can get running again, it may save your fingers/arm/life or job. Usually there’s a permit involved and you should know the conditions of the permit, or have your own permit to join a job.

              • batmaniam@lemmy.world
                link
                fedilink
                arrow-up
                2
                ·
                edit-2
                7 months ago

                You know, we’re not required to do that but because of you I just ordered some locks and labels for the field kit (edit: as well as breaker locks).

                Our stuff is always temp (8-12mo) and on a dedicated line. The sites we’re on always involve coordinating with the clients appropriate people and specifically stating we’re not trained in this to their standards (which is why I know some of this stuff but not to the letter), but an extra layer is always a good idea. No harm ever came from an extra lock that couldn’t be fixed.

                Thanks.

                edit: for the record it’s not like we’re negligent, everything in our system is designed to fail-safe, and we compartmentalize power delivery, but still, no harm in a few extra items in the kit.

    • thetreesaysbark@sh.itjust.works
      link
      fedilink
      arrow-up
      11
      ·
      7 months ago

      Had the same thought. The American date format must be the least intuitive, but as a nerd that likes to order files and folders YYYY/MM/DD is just a win.

  • hydration9806@lemmy.ml
    link
    fedilink
    arrow-up
    20
    ·
    7 months ago

    The real question is whether this was put up on April 2 or is a really old sign from Feb 4. ISO 8601 saves lives people, but probably not as many as proper lock out/tag out procedures.

  • Captain Aggravated@sh.itjust.works
    link
    fedilink
    English
    arrow-up
    20
    ·
    7 months ago

    Today on hoodroolic press channel, ve haff an intern, a new intern who’s cleaning the press, and he looks prooty dangerous, so ve must deel vif it.

  • Sjmarf@sh.itjust.works
    link
    fedilink
    arrow-up
    15
    ·
    7 months ago

    Well, the button says “pull to start” and the sign says “do not push” so we’re good to start it, right?