• minzastro@programming.dev
    link
    fedilink
    English
    arrow-up
    7
    ·
    20 hours ago

    I love such curve-fitting techniques. By 2025 we can launch 1t into space for a few cents, if we follow the purple line.

    • Fermion@feddit.nl
      link
      fedilink
      English
      arrow-up
      2
      ·
      16 hours ago

      It’s also absurd that the fit line dives down to be cheaper and earlier than an optimistic projection that will likely move further to the top right as time progresses. That’s a chart with an agenda, not an analytical regression.

      • Fermion@feddit.nl
        link
        fedilink
        English
        arrow-up
        2
        ·
        16 hours ago

        I think this actually is a linear regression plotted on a log y graph.

        Which a linear regression is a bad choice for something that must be asymptotic at best.