You always hear the phase “9 to 5” and also the song with the same name. Assuming you include 1 hour worth of breaks (30 minute lunch and two 15 minute breaks), you’re only working for 7 hours a day which comes up to 35 hours a week.

Now it feels like you have to work 8 hours a day (for a total of 40 hours of actual work), plus your other time off meaning you’re really there for 9 hours each day (for a total of 45 hours). Am i looking at that wrong, or did expected times change, and if so, when?

  • bobs_monkey@lemm.ee
    link
    fedilink
    arrow-up
    18
    ·
    1 month ago

    Most jobs I’ve had will schedule 8-430/9-530/etc, so that you work a full 8 hours but you have a 30min mandatory unpaid lunch break. The two 15 min breaks are paid, but they were also “discouraged.”

    • NoIWontPickAName@kbin.earth
      link
      fedilink
      arrow-up
      3
      ·
      1 month ago

      Man, I have worked some shitty jobs and not one of them as ever discouraged me in any way from taking my breaks.

      Days off is a whole other thing though

      • bobs_monkey@lemm.ee
        link
        fedilink
        arrow-up
        2
        ·
        1 month ago

        I’ve been in construction for many years, and the norm is working straight through till lunch then straight till the end of the day. Usually no one bats an eye if you take a few minutes to catch your breath or smoke if you bust ass, but yeah there typically isn’t a designated 10-15 all stop. That and most guys usually take 20 min to take a shit, so I guess it tends to balance out.

        • prole
          link
          fedilink
          arrow-up
          1
          ·
          edit-2
          1 month ago

          To be fair, construction workers get paid a shitload. Fucks your body up though from what I understand.