• Tobberone@lemm.ee
    cake
    link
    fedilink
    arrow-up
    4
    ·
    edit-2
    3 months ago

    I wish we could. That capacity is already booked. The batteries we are deploying needs to be used as local storage. And this is before the EU mandate on solarpanels on all roof tops has taken effect. The grid can’t expand at that rate, unfortunately.

      • Tobberone@lemm.ee
        cake
        link
        fedilink
        arrow-up
        3
        ·
        3 months ago

        That’s what we are reduced to. That is what I mean. I also say that in the EU directive called EED, the union demands that, starting 2026, every public body needs to put PV-cells on the roofs of the buildings they use.

        That will be noticeable.

          • Tobberone@lemm.ee
            cake
            link
            fedilink
            arrow-up
            3
            ·
            3 months ago

            As long as we find a way to make use of the excess electricity produced, yes. Today we don’t have enough intermittent energy users. For storage, or otherwise.

            There are initiatives calling for/demanding an expanded hydrogen infrastructure, for instance, so that could be one thing. I believe Germany is the leading country of such initiatives.