• Halcyon@discuss.tchncs.de
    link
    fedilink
    English
    arrow-up
    9
    ·
    11 个月前

    Don’t leave out the deconstruction of old nuclear plants after their operational time and the storage of radioactive waste. It’s very laborious and expensive.