Whoopsie! Sydney’s road planners just discovered induced demand is a thing, after opening a new motorway.

For those outside Sydney, the New South Wales state government recently opened a new spaghetti intersection just west of Sydney’s Central Business District.

It was supposed to solve traffic. Instead, it’s turned into a giant car park:

"For the third straight day, motorists and bus passengers endured bumper-to-bumper traffic on the City West Link and Victoria Road. A trip from Haberfield to the Anzac Bridge on the City West Link averaged an agonising 44 minutes in the morning peak on Wednesday.

"Several months ago, Transport for NSW’s modelling had suggested traffic from the interchange would add only five to 10 minutes to trips on Victoria Road through Drummoyne and over the Iron Cove Bridge during morning peaks.

“Those travel delays have now blown out.”

So what do motorists say when their shiny new road that was supposed to solve traffic instead turns into a massive traffic jam?

‘Dude! Just one more lane!’

From the article:

"[Roads Minister John] Graham and his Transport boss Josh Murray appear reluctant to do what many motorists reckon is the obvious solution.

“That is, add lanes or make changes at the pinch-points that are causing the pain. A three-lane to one merge point from Victoria Road onto the Anzac Bridge, along with two lanes merging into one on the City West Link, are proving to be painful bottlenecks.”

https://www.smh.com.au/national/nsw/how-planners-got-rozelle-traffic-modelling-horribly-wrong-20231129-p5ensa.html

#roads #traffic #cars @fuck_cars @sydneytrains @urbanism #urbanism #UrbanPlanning #motorways #fuckcars

  • AJ Sadauskas@aus.socialOP
    link
    fedilink
    arrow-up
    1
    ·
    1 year ago

    @WaxedWookie @AvonVilla When the prime minister, the state premier, and the transport Minister all hype up an infrastructure project by promising less traffic to the city, many people will make transport decisions accordingly.

    That’s the big picture here.

    Here’s an example of the hype the federal and state governments were building for *years* around WestConnex and the Rozelle Interchange:

    "Prime Minister Scott Morrison said the $16.8 billion project was cutting travel times and supporting thousands of families with work as Sydney and Australia were reopening from COVID lockdowns.

    "“This breakthrough isn’t just for a tunnel, but it’s a breakthrough for getting people home sooner and safer and helping workers to move around,” the Prime Minister said.

    "“As well as the 9,000 jobs this project has been delivering, the tunnel is going to make it easier for people across Sydney to pick up work and jobs that just wouldn’t have been possible before with traffic.

    "“As we reopen Sydney and Australia, projects like this bypass and our record $110 billion infrastructure investment are going to give our economy even more of a boost.”

    "New South Wales Premier Dominic Perrottet said the third stage of WestConnex is now another step closer to forming a western bypass of the Sydney CBD.

    "“This project will change the lives of thousands of people, bypassing dozens of sets of traffic lights and allowing an uninterrupted drive from the Blue Mountains to Rozelle,” the Premier said.

    "“As part of the New South Wales Government’s record $108.5 billion investment pipeline, WestConnex is already easing congestion, creating jobs and connecting communities, right across our city.

    "“Our Government has its eye to the future and this breakthrough will complete a ‘missing link’ between the new M4 Tunnels at Haberfield and the M8 at St Peters.”

    "Federal Minister for Communications, Urban Infrastructure, Cities and the Arts Paul Fletcher said the Commonwealth Government had co-funded WestConnex from the outset with a grant of $1.5 billion and a concessional loan of $2 billion.

    "“This is a major milestone in what is one of the most significant road infrastructure projects in the country, which is already delivering major benefits for Sydney commuters by reducing travel times, easing congestion and improving safety,” Minister Fletcher said.

    "“When opened to traffic in 2023, the M4-M4 Link Tunnels and Rozelle Interchange will complete the WestConnex project, providing improved links between key employment hubs and local communities.”

    "NSW Minister for Transport and Roads Rob Stokes said 22 of the 33 kilometres of WestConnex would be underground, including the 7.5 kilometres that make up the M4-M5 Link Tunnels.

    ““The M4-M5 Link Tunnels will remove tens of thousands of vehicles from surrounding streets, including Parramatta Road, and will help slash up to 40 minutes from an average peak journey between Parramatta and the Sydney Airport.””

    https://www.acciona.com.au/updates/news/westconnex-m4-m5-link-tunnels-the-final-breakthrough/?_adin=02021864894

      • WaxedWookie@lemmy.world
        link
        fedilink
        arrow-up
        1
        ·
        1 year ago

        Brevity isn’t your strong suit. I’ll keep this simple.

        I assume you wouldn’t argue that the current delays will sustain for the foreseeable future. The induction drivers won’t disappear for the foreseeable future. With those 2 things being true, how could you say these delays are induced demand rather than temporary teething issues with opening?

        • Lee 🌏@aus.social
          link
          fedilink
          arrow-up
          1
          ·
          1 year ago

          @WaxedWookie @AvonVilla
          Because it’s the same story we have seen 1000 times all over the world for 70 Years. You have to look at the problem holistically. Simply thinking about cars and roads, in isolation to the whole city, how people behave, how we live and work, is a recipe for failure. I think this explains the issue well enough.

          • WaxedWookie@lemmy.world
            link
            fedilink
            arrow-up
            1
            ·
            1 year ago

            I’ve been clear I think induced demand will be an issue here. There’s no dispute on that, but you’re refusing to bite the bullet on whether these more extreme teething issues (which I’m asserting aren’t induced demand) will stay.

            If you say the delays will stay, I’m confident you’ll be proven wrong in fairly short order - the traffic will ease, proving it’s not induced demand. The scale of the induceed demand can be fairly measured at that point.

            If you don’t think the delays will stay when the induction factors remain unchanged, you have to concede this isn’t induced demand - it’s short term teething, which is my position.

            • AJ Sadauskas@aus.socialOP
              link
              fedilink
              arrow-up
              0
              ·
              1 year ago

              @WaxedWookie @MrLee I’m happy to be proven wrong, but I think traffic is likely to remain awful during peak hours on the Anzac Bridge and Victoria Rd. (It’s likely to ease up temporarily over the Christmas break, but will worsen again after Australia Day.)

              Even before WestConnex, the Anzac Bridge already wasn’t exactly great during peak hour from all the traffic heading through Drummoyne along Victoria Road.

              The new WestConnex motorways have made that worse.

              If you’re on the M4 extension, how do you get to the CBD? Either you take the Parramatta Rd turnoff at Ashfield, or you go through the spaghetti intersection to the Anzac Bridge.

              If you’re heading from the airport on the new M8, how do you get to the CBD? You go through the spaghetti intersection to the Anzac Bridge.

              And if you’re on the M5, how do you get to the CBD? Well, you can take Southern Cross Drive under the airport to the Eastern Distributor, or you take the M8 to the spaghetti intersection to the Anzac Bridge.

              During the morning and evening peak, a lot of commuters want to travel to or from the city at the same time. And that traffic is being funnelled from the M4, M5 and M8 on to the Anzac Bridge, and then to the CBD offramps.

              The claim was that these new WestConnex motorways were going to take traffic off other roads. So for example the M4 was going to take traffic off Parramatta Road.

              What it’s ended up doing is inducing more traffic demand, and that additional demand is being dumped on to the Anzac Bridge.

              Parramatta Road is still terrible during peak hour, and there’s now even more cars travelling along the M4.

              People have also made housing and long-term travel decisions based on the claims that WestConnex would make car travel quicker to the CBD from western and southern Sydney.

              Are there people driving slowly while they figure out which lane to take through the spaghetti intersection? Yes there are.

              But. The bigger issue is that the new WestConnex motorways have induced additional traffic demand, and a lot of it is trying to cross the Anzac Bridge.

              • WaxedWookie@lemmy.world
                link
                fedilink
                arrow-up
                1
                ·
                1 year ago

                It’s been reported that the travel times are already dropping by 10%+ in the few days since opening… That sure points to these delays being mostly due to teething that’s beginning to ease already.

                • AJ Sadauskas@aus.socialOP
                  link
                  fedilink
                  arrow-up
                  0
                  ·
                  1 year ago

                  @WaxedWookie It was also deliberately opened at the end of the year because there’s less traffic demand:

                  “But the government and motorway operator Transurban – who have a contract to run WestConnex until 2060 – say the traffic peak won’t come until February.”

                  So the real test won’t be how it performs on a Friday or weekend. It’s how it will do once everyone’s back at work in February.

                  Again, the underlying issue seems to be extra traffic that wouldn’t be there if the M4/M5/M8 motorway extensions hadn’t opened.

                  There’s a lot of traffic being funnelled on to a bridge that was already at capacity.

                  “Since the project opened on 19 November, morning drivers have headed into the city and found three lanes on two of the main arterial roads abruptly merging into one. Feeder streets from nearby suburbs were jammed, with movement slowing to barely one block an hour at the worst of the crunch times.”

                  The Inner West Council is claiming that department officials were concerned behind closed doors in the months before the interchange opened:

                  "Darcy Byrne, the mayor of Inner West Council, oversees a region that has endured a decade of dusty and noisy construction. He says Transport for New South Wales officials ‘were very concerned’ in briefings three months ago about how WestConnex was going to perform.

                  “‘We have warned for a very long time [that] when you tried to funnel such a greatly expanded amount of traffic into the same number of lanes at the Anzac Bridge at Victoria Road, it was going to be a tsunami of traffic chaos,’ he said.”

                  https://www.theguardian.com/australia-news/2023/dec/02/a-tsunami-of-traffic-chaos-the-new-sydney-motorway-prompting-calls-for-a-royal-commission

                  • WaxedWookie@lemmy.world
                    link
                    fedilink
                    arrow-up
                    1
                    ·
                    1 year ago

                    I guess we can just revisit this in February then. If the time to get through the mess remains around 90 minutes, we’ll call that one for induced demand. I think a meaningful reduction from that mark toward the actual baseline with induced demand is going to prove otherwise.