The trains will mainly run between Merced and Sacramento on Union Pacific track. That route is part of the second phase of California hsr, so after the LA - San Fransico part is built. For that the relativly cheap hydrogen infrastructure is propably cheaper, at least for three round trips per day right now. Long term it will be built properly.
The trains will mainly run between Merced and Sacramento on Union Pacific track. That route is part of the second phase of California hsr, so after the LA - San Fransico part is built. For that the relativly cheap hydrogen infrastructure is propably cheaper, at least for three round trips per day right now. Long term it will be built properly.