• Bytemeister@lemmy.world
      link
      fedilink
      English
      arrow-up
      9
      ·
      7 days ago

      Hypothetically, I would look up how to do it.

      But, if I had to make something up on the fly, I would get a length of rebar and cut it in half at an angle so you get two equal lengths spikes, then I would find out what size trees are most likely to be targeted in a logging campaign, then climb up to that height on the tree and hammer them in.

      Hypothetically.