• lad@programming.dev
    link
    fedilink
    English
    arrow-up
    7
    ·
    3 months ago

    To be fair, if there’s two people in the team and one of them is a junior, I would’ve expected nothing to be done at all, especially if it’s as long as three weeks

    I think, I would’ve left the junior some language or design research, and some questions to ponder about in the meantime, if I were in this situation