      As quickly as possible is not the only parameter. Consequences is an important one too. We can technically turn off half the grid right now, but there would be severe consequences to that.

      Smart grid is a cool thing, but we are far from it still if it needs to work from renewables only.

        • @bouh@lemmy.world
          link
          fedilink
          English
          111 months ago

          That is exactly the kind of fallacy I’m talking about. That somehow renewable and nuclear would be exclusive to each other. Or that renewable can replace all the fossile faster than a nuclear power plant can be built.

          We need both. We need to start building nuclear power plants now, and we need to build renewables. This is the best allocation of resources. And this is the only solution out of fossiles.

            • @bouh@lemmy.world
              link
              fedilink
              English
              111 months ago

              Wrong. The question is how expensive a determine MWh power is, not a single unit price ; prices for 2MWh of renewable or nuclear are comparable.

              Secondly, renewable and nuclear don’t mobilise the same resources, both human and material, thus it will always be faster to build both at the same time.

              Thirdly, renewable take a lot of space, which means it’s easy to build the first farms, but the more you have, the harder it is to find space for it to build ; not all countries are islands or massive continents with large deserts.

                • @bouh@lemmy.world
                  link
                  fedilink
                  English
                  111 months ago

                  I’m talking prices to build 2MW power gen capacity, also considering the effective uptime, because wind or solar don’t have 100% uptime. Construction prices are equivalent for nuclear and solar. And nuclear doesn’t take 20 years to build, contrary to what anti-nuclear propaganda pretends.

                  Finally electrical engineers are not the only people needed for these projects. And if electrical engineers are the limiting factor to build new stuff, we’re simply screwed.